CTtec engineering software
SYNCHRO Cost
Historical SYNCHRO Cost permission and cost-record reference; no verified current standalone sale or CTtec reseller entitlement.
Bentley permission documentation names SYNCHRO Cost access. Separately, Bentley retired SYNCHRO Contracts on 30 September 2026. These historical labels are not interchangeable, and neither establishes a currently purchasable SYNCHRO Cost SKU or feature-equivalent successor.
Commercial terms and product entitlements are confirmed individually. An editorial listing does not itself confirm CTtec resale authorization.
Need direct support? Contact CTtecEngineering value
Where SYNCHRO Cost fits
Use the product's stated engineering scope to determine its relevance before selecting an edition or planning a transition.
Review change effects on forecast cost
Document historical SYNCHRO Cost system requirements
Technical scope
Capabilities and engineering tasks
These are product-family engineering topics, not an assertion that every edition, version or historic installation includes every feature.
- Construction cost tracking context
- Change-order management workflow
- Budget and commitment review
- Progress-to-cost reporting relationships
Common project applications
- Construction financial control
- Capital project cost monitoring
- Legacy SYNCHRO workflow analysis
For regulated projects, confirm software version, standards and available modules against current manufacturer documentation.
Practical workflow
From project information to engineering review
Inventory historical costing workflow and data
Confirm supported current SYNCHRO modules
Map cost controls and reporting to an authorized solution
CTtec-managed content
Additional engineering information
Implementation considerations
- Treat existing cost and commitment information as historical; no current standalone licensing is confirmed.
- Distinguish the historic Cost permissions from SYNCHRO Contracts before reviewing exports. Contracts was fully retired on 30 September 2026; no continuing Contracts access or replacement is promised.
Technical interfaces
- Inventory project budgets, cost codes and exports before attempting any Bentley-approved successor workflow.
Official documentation
Manufacturer guidance and availability
Commercial decision: UNVERIFIED. Do not quote or advertise new SYNCHRO Cost licences. Existing cost and contract records require separately scoped export/support review. Bentley and CTtec commercial-owner written confirmation is mandatory before any offer.
Reviewed 2026-10-27 · Claim review: Selected lifecycle and licensing details require revalidation. Manufacturer materials remain authoritative for technical requirements and product terms.
Product information source
Bentley Systems
Open manufacturer source Bentley SYNCHRO Contracts retirement FAQ — 30 September 2026Images on this page are original CTtec conceptual artwork. No manufacturer software screenshots or third-party images are used.
Engineering and licensing FAQ
Questions before selecting SYNCHRO Cost
Does a Bentley SYNCHRO Cost permission establish a currently sold product?
No. Bentley KB0018680 names an access permission for SYNCHRO Cost, not a current standalone product offer, maintained licence, supported edition or CTtec resale entitlement. All new-sale claims remain commercially unverified pending written Bentley and CTtec confirmation.
Is historical SYNCHRO Cost the same thing as SYNCHRO Contracts?
No equivalence is established. Bentley independently states that SYNCHRO Contracts stopped accepting new contracts in November 2025 and was fully retired on 30 September 2026 (KB0048110). Preserve cost codes, contract exports and schedules, and determine which module originally held the data before assessing any migration.
Can CTtec quote a new SYNCHRO Cost licence or promise migrated Contracts access?
No. New-sale, support and replacement entitlements are unverified. CTtec can discuss historical data requirements and seek a written Bentley-approved commercial route; a retired Contracts module is not proof that SYNCHRO Cost is a current successor.
Technical consultation
Discuss SYNCHRO Cost for your project
Assess your existing files, software version and next steps with the relevant manufacturer.