UAE +971509932646 ME +97150 2306503 India 00 91 98192 44332 UK +44 7883 758999

CTtec engineering software

Renamed productBentley Systems

OpenWindPower

Historical OpenWindPower family spanning fixed-foundation and floating offshore wind analysis.

Bentley renamed OpenWindPower Fixed Foundation to SACS Wind Turbine, while OpenWindPower Floating Platform is now MOSES Wind Turbine. The two workflows are not interchangeable.

Official manufacturer information

Commercial terms and product entitlements are confirmed individually. An editorial listing does not itself confirm CTtec resale authorization.

Need direct support? Contact CTtec
Original CTtec diagram contrasting seabed-fixed SACS Wind Turbine foundation against moored floating MOSES Wind Turbine platform; schematic only
Original CTtec engineering concept illustration · not a manufacturer screenshot

Engineering value

Where OpenWindPower fits

Use the product's stated engineering scope to determine its relevance before selecting an edition or planning a transition.

Identify which OpenWindPower variant generated the historical model

Match fixed and floating projects with the relevant Bentley product family

Assess past model and licensing assumptions before a project transition

Technical scope

Capabilities and engineering tasks

These are product-family engineering topics, not an assertion that every edition, version or historic installation includes every feature.

  • Fixed-foundation structural analysis context for historic OpenWindPower Fixed Foundation
  • Floating-platform motion and mooring analysis context for historic OpenWindPower Floating Platform
  • Wind and wave actions in offshore turbine structural assessments
  • Legacy model compatibility and entitlement review

Common project applications

  • Fixed-bottom offshore wind foundations
  • Floating offshore wind platforms and mooring systems
  • Historical offshore wind study reviews

For regulated projects, confirm software version, standards and available modules against current manufacturer documentation.

Practical workflow

From project information to engineering review

  1. Identify original software variant, version and project model type

  2. Review fixed-foundation studies against SACS Wind Turbine and floating-platform studies against MOSES Wind Turbine

  3. Revalidate analysis assumptions, model transfer and manufacturer licensing terms

CTtec-managed content

Additional engineering information

Implementation considerations

  • Confirm whether the historic model is fixed-bottom or floating, including environmental loads, station-keeping and legacy software version where applicable.
  • Fixed-bottom foundations and floating, moored structures need different fatigue/environmental model reviews; the historical name alone does not select a SACS or MOSES turbine workflow.

Technical interfaces

  • Check compatibility of fixed OpenWindPower project outputs with SACS Wind Turbine and of floating-project outputs with MOSES Wind Turbine; do not assume automatic conversion.

Official documentation

Manufacturer guidance and availability

For a fixed foundation, review SACS Wind Turbine; for a floating platform, review MOSES Wind Turbine. Confirm existing file compatibility and rights with Bentley before any purchase or migration.

Reviewed 2026-10-27 · Claim review: Official manufacturer source checked. Manufacturer materials remain authoritative for technical requirements and product terms.

Product information source

Bentley Systems

Open manufacturer source MOSES Wind Turbine — former OpenWindPower Floating Platform

Images on this page are original CTtec conceptual artwork. No manufacturer software screenshots or third-party images are used.

Engineering and licensing FAQ

Questions before selecting OpenWindPower

Which current Bentley products correspond to the two OpenWindPower variants?

Bentley identifies OpenWindPower Fixed Foundation as SACS Wind Turbine from May 2025. Its former OpenWindPower Floating Platform offering is now MOSES Wind Turbine. First identify which variant created the existing project model.

How do fixed and floating offshore wind assessments differ?

SACS Wind Turbine addresses fixed-bottom support structures such as jackets, while MOSES Wind Turbine focuses on floating-platform hydrodynamics, motions and mooring or station-keeping. Check the project design basis and supported modules for the chosen Bentley product.

Does the OpenWindPower name guarantee model compatibility or a current licence?

No. Confirm historical product variant, installed version, model formats and existing entitlements with Bentley. Test representative legacy projects before planning a transition; this CTtec record does not offer a separate new OpenWindPower licence.

Technical consultation

Discuss OpenWindPower for your project

Assess your existing files, software version and next steps with the relevant manufacturer.

Contact CTtec